
Free professional concrete calculators for DIYers and contractors

SlabCalc offers a suite of professional-grade concrete calculators designed for both DIY homeowners and contractors. It provides precise material estimates for various concrete projects, helping users avoid ordering too much or too little material. The platform includes multiple shape calculators with imperial and metric support, adjustable waste factors, bag counts, and cost estimates, all accessible without signup or paywalls. SlabCalc also offers educational guides and a concrete glossary to help users understand the calculations and make informed decisions.
Calculate concrete volume for slabs, cylinders, curbs, stairs, footings, and more with adjustable dimensions.
Supports both imperial and metric units for global usability.
Add configurable waste percentages to account for spillage and uneven ground.
Calculate the number of concrete bags needed for various bag weights.
Estimate project costs based on local concrete prices and project size.
Access comprehensive guides and glossaries to understand concrete work and calculations.
Use all features freely without creating an account or providing personal data.
Free with no signup required
A 10×10 foot slab at 4 inches thick requires approximately 0.62 cubic yards of concrete, or about 28 bags of 80-lb premix. Add 10% for waste, bringing the practical order to 0.68 cubic yards or 31 bags.
A cubic yard is 27 cubic feet of concrete — a cube measuring 3 feet on each side. It weighs approximately 2 tons (4,000 lb) when wet. At 4 inches thick, one cubic yard covers about 81 square feet.
One cubic yard of concrete requires approximately 45 bags of 80-lb premix, or 60 bags of 60-lb premix. For comparison, a ready-mix truck delivers concrete in full or partial cubic yards and is more cost-effective for pours over 1 yard.
First calculate cubic yards using the formula: Length (ft) × Width (ft) × Thickness (ft) ÷ 27. Then multiply cubic yards by 45 to get the number of 80-lb bags needed. For example, a 10×10 slab at 4 inches thick = 10 × 10 × 0.333 ÷ 27 = 0.62 yards × 45 = 28 bags.
Ready-mix concrete delivered by truck typically costs $130–$170 per cubic yard, depending on mix strength and location. Bagged concrete (80-lb bags at ~$6 each) costs roughly $270 per equivalent cubic yard — more expensive per unit but practical for small jobs with no minimum order.
Traffic, engagement, sources and keywords are Similarweb-style estimates, refreshed monthly. Verified traffic comes from a connected Google Analytics / Search Console.
No founders named on the site yet. The founder can claim this profile to add themselves.
<a href="https://www.exitfounder.io/startup/slabcalc" target="_blank" rel="noopener"><img src="https://www.exitfounder.io/badge/slabcalc.svg" alt="SlabCalc — featured on ExitFounder" width="220" height="56" /></a>Shows live Domain Rating and upvotes for slabcalc. Cached for an hour.
Have an alternative? Show it to everyone comparing SlabCalc.
Appear on this page